Main stages of repair in the home

Main phases of repair in the apartment.

How to begin repair of the apartment?

The very first phase of the repair work of old houses is the destruction and dismantling to start with of the worn out walls and partition walls, getting rid of the wall and ceiling finishing. This phase is among the most "filthy" phases of the repair.

One more among the most important and "dirty" works is the window block replacement. It is necessary to do this to start with because dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature and wetness are unallowable). After mounting windows and windowsills it is needed to load them right away in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following stage is circuitry. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipes to make sure electrical safety and boost reliability. The pipeline safeguards circuitry from external damages and enables to change the wire completely without breaking walls and flooring merely by inserting the new wire instead of the old one.

House Painting follows the wiring. The regular mistake throughout the synchronised conducting of such works occurs when workers forget to lay out one of the cable televisions and house painters have already plastered and ravelled the wall. As an outcome, extra works are required to seal chases after on the finished wall. The places of the feed switch and wall outlet place and their number must be thought-out ahead of time. The scheme of power wiring is usually consisted of into the style project.

Later on the system must be all set to service in case of failures. In addition to the circuitries, the telephone cable television and the television cable television are set out. The power cable should not be laid out near the telephone and antenna cables to avoid noise pickup and disturbance. The most strange moment is laying out the television cable television. In order to make two (or three) TV sets in the home the second cable television is typically merely "strongly soldered" in parallel, so the cable television resistance is lowered. As a result, the screen quality is deteriorated, lots of programs can't be received and etc. In order to prevent such situation it is needed to welcome a specialist with special devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting process, that is why it is performed all at once in all premises, if it is possible. Delays are linked with the innovation. Each applied layer of the plaster (or filling out finishing) should dry completely before the work will continue.

Works in sanitary arrangements and the kitchen start at the same time with house painting. It is better to meet so-called "unclean" operate in the top place and at the same time. In accordance with the plan of the hygienic service technician area welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then works in sanitary arrangements are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is assembling ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and accessories are mounted.

After wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this stage in order to save their surface area look. The finish puttying of walls is conducted all at once. The technically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures wetness of the material.

The following stage is the process of fill. Fill can be made with different materials-- from normal masonry cement-sand mix to self-aligning floors. The advantage of the easy mix is its cheapness, the disadvantage is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next stage of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floorings are far more costly, but more technological. Lining up happens practically "immediately" i.e. fluid option of mixture is put out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floorings with adjustable floor battens are mounted.

After fill door boxes and door are installed. Setup of doors need to take into the account thickness of future flooring covering. After setup the door can be removed its hinges and removed up until completion of repair or packed into polyethylene movie to secure from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the absolutely dry overlay.

Finishing of the floor installing depends upon the planned covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.

In facilities where surface covering of the flooring is laminated floor covering or parquet hoard, the regular wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The discussed repercussion is connected just with such scrambling process when the terrific amount of dust is produced. In spite of the fact that great floor mills are geared up with the vacuum cleaner, the sufficient quantity of dust is precipitated on surrounding topics including walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the Fix-It Right Plumbing parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper Go here pasting.

After this the main works can be thought about to be completed. It is left only to install the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is essential to note that the series of works was noted in general and can alter depending on the certain situation-- the number of rooms in premise, your resources, peculiarities of the construction of the multilevel premises. It is based upon sound judgment and every person capable of analysis can independently develop such a series.